Back to Project List

50th St Grade Separation

Edmonton, Ab



Completion Date
June 2026
Project Information
Construction consultant & General Contractor for the 50th Street Grade Separation over the CP rail. Provide estimates, schedules, constructability and design reviews at the pre-tender stage. Construction of 2 bridge structures over CP rail, varius MSE and CIP walls, utility relocates, stormwater reservoir, drainage and roadworks.


Alberco Construction Ltd.
14 Rayborn Crescent
St. Albert, Alberta, Canada
T8N 4B1
780-459-7110